Brazil PAMPA Coal-fired Power Plant Project

Brazil PAMPA Coal-fired Power Plant Project

At 19:45 on the evening of June 20, local time in Brazil, the PTR (RELIABILITY TEST RUN) of the PAMPA project in Brazil was a success, laying a solid foundation for the project to be put into commercial operation at the end of June. The Brazil PAMPA coal-fired power station project is located in Candiota, Rio Grande do Sul, Brazil. The construction scale is a 345MW coal-fired unit. It is the largest coal-fired power station currently under construction in Brazil. Shandong Electric Power Engineering Consulting Institute is responsible for the EPC general contract construction. The project design, equipment manufacturing, installation, commissioning and performance testing of the power plant project are implemented in accordance with international standards such as ASME, ASTM, ISO and IEC, and comply with local mandatory standards and specifications in Brazil. After completion, it will greatly change and enhance the power supply of Rio Grande do Sul, improve the living environment and quality of life of residents, and promote and drive the economic development around the power plant and even in the entire Rio Grande do Sul. Shandong Shankuang Machinery Co., Ltd. has undertaken the design, manufacturing, installation and commissioning services of the large inclination belt conveyor, mobile unloader, belt conveyor and other products in the power station project. Because the local coal quality is very poor, the calorific value is only 2,000 kcal, and the ash powder is relatively large, so the equipment such as belt conveyors for coal transportation must run at full load for 20 hours a day. The high-angle belt conveyor, mobile unloading truck, belt conveyor and other products provided by the company did not have any problems during operation, which ensured that the generator was running at full load for ten days, and better guaranteed the PTR (reliable and reliable) of the coal-fired power station. Sexual test RELIABILITY TEST RUN) was a success. Shandong Electric Power Engineering Consulting Institute, PAMPA coal-fired power station contractors and users are very satisfied with the company's products and give high praise. On January 30, 2019, Shandong Shankuang Machinery Co., Ltd. also received a letter of thanks from Shandong Electric Power Engineering Consulting Institute Co., Ltd. for the Brazil PAMPA power station project. In the letter of thanks, he fully affirmed the work achievements of all the team members of the company's participation in the Brazilian PAMPA power station project team, praised the high-quality products provided and the high-quality services provided during the construction process, and highly praised our company's on-site service engineer Di Dong Comrade Qian's technical level and comprehensive quality. In recent years, Shandong Shankuang Machinery Co., Ltd. has actively responded to the national "Belt and Road" initiative, and has successively signed the national "Belt and Road" key projects - Indonesia Java coal-fired power plant project, Pakistan CLP Hubu 2 × 660MW coal-fired power generation And the terminal project, CMEC general contract Serbia Kostolac-B power station phase II project, Dubai UAE Dubai Hasyan clean coal-fired power plant phase I and terminal project and other export project contracts. In 2018, the company focused on organizing the design and production to complete export projects such as Hubu and Dubai, which are more technically difficult, have the strictest quality requirements, and implement European and American standards. It will further increase its technological innovation capability, strive to promote the upgrading of leading products, create a market for mid-to-high-end products, and let Shanxi Mining Company "go global" with more advanced technology and high-quality products, and make new achievements for the country's "Belt and Road" construction. greater contribution!
Hotline:+86-537-2228209
Brazil PAMPA Coal-fired Power Plant Project
Product description

At 19:45 on the evening of June 20, local time in Brazil, the PTR (RELIABILITY TEST RUN) of the PAMPA project in Brazil was a success, laying a solid foundation for the project to be put into commercial operation at the end of June.

The Brazil PAMPA coal-fired power station project is located in Candiota, Rio Grande do Sul, Brazil. The construction scale is a 345MW coal-fired unit. It is the largest coal-fired power station currently under construction in Brazil. Shandong Electric Power Engineering Consulting Institute is responsible for the EPC general contract construction. The project design, equipment manufacturing, installation, commissioning and performance testing of the power plant project are implemented in accordance with international standards such as ASME, ASTM, ISO and IEC, and comply with local mandatory standards and specifications in Brazil. After completion, it will greatly change and enhance the power supply of Rio Grande do Sul, improve the living environment and quality of life of residents, and promote and drive the economic development around the power plant and even in the entire Rio Grande do Sul.

Shandong Shankuang Machinery Co., Ltd. has undertaken the design, manufacturing, installation and commissioning services of the large inclination belt conveyor, mobile unloader, belt conveyor and other products in the power station project.

Because the local coal quality is very poor, the calorific value is only 2,000 kcal, and the ash powder is relatively large, so the equipment such as belt conveyors for coal transportation must run at full load for 20 hours a day. The high-angle belt conveyor, mobile unloading truck, belt conveyor and other products provided by the company did not have any problems during operation, which ensured that the generator was running at full load for ten days, and better guaranteed the PTR (reliable and reliable) of the coal-fired power station. Sexual test RELIABILITY TEST RUN) was a success. Shandong Electric Power Engineering Consulting Institute, PAMPA coal-fired power station contractors and users are very satisfied with the company's products and give high praise.

On January 30, 2019, Shandong Shankuang Machinery Co., Ltd. also received a letter of thanks from Shandong Electric Power Engineering Consulting Institute Co., Ltd. for the Brazil PAMPA power station project. In the letter of thanks, he fully affirmed the work achievements of all the team members of the company's participation in the Brazilian PAMPA power station project team, praised the high-quality products provided and the high-quality services provided during the construction process, and highly praised our company's on-site service engineer Di Dong Comrade Qian's technical level and comprehensive quality.

In recent years, Shandong Shankuang Machinery Co., Ltd. has actively responded to the national "Belt and Road" initiative, and has successively signed the national "Belt and Road" key projects - Indonesia Java coal-fired power plant project, Pakistan CLP Hubu 2 × 660MW coal-fired power generation And the terminal project, CMEC general contract Serbia Kostolac-B power station phase II project, Dubai UAE Dubai Hasyan clean coal-fired power plant phase I and terminal project and other export project contracts. In 2018, the company focused on organizing the design and production to complete export projects such as Hubu and Dubai, which are more technically difficult, have the strictest quality requirements, and implement European and American standards. It will further increase its technological innovation capability, strive to promote the upgrading of leading products, create a market for mid-to-high-end products, and let Shanxi Mining Company "go global" with more advanced technology and high-quality products, and make new achievements for the country's "Belt and Road" construction. greater contribution!

MORE PRODUCTS

Messages

WRITE A MESSAGE TO US

Username used for comment:
客户留言
Description:
验证码
There is currently no content to display
Please add data record on website background.

Shandong Shankuang Machinery Co.,Ltd

ADD:No. 11, ji'anqiao North Road, Jining City, Shandong Province

 

Hotline:+86-537-2228209

TEL:+86-537-2226931 

FAX:+86-537-2228529

ZIP:272041

E-mail:master@sdkj.com.cn

WEB:www.sdkj.com.cn

1

Webpage Copyright:Shandong Shankuang Machinery Co.,Ltd   鲁ICP备11032345号